Setup Steps for Multi-node CVP Cluster

 

Assign to each of the three CVP VMs a role (primary, secondary or tertiary).
  • The roles may be assigned in any way, but the roles must be kept consistent throughout the installation. No two nodes may share the same role.
  • Maintain the installation order starting with primary, then secondary and finally tertiary.
  1. Access the primary, secondary and tertiary CVP VMs on the respective appliance via WOK. See Web Access into CVX and CVP Consoles via WOK.
  2. Refer to the CloudVision Configuration Guide for Shell-Based Configuration of Multi-Node.

Electrostatic Discharge (ESD) Precautions

Observe these guidelines to avoid ESD damage when installing or servicing the appliance.
  • Assemble or disassemble equipment only in a static-free work area.
  • Use a conductive work surface (such as an anti-static mat) to dissipate static charge.
  • Wear a conductive wrist strap to dissipate static charge accumulation.
  • Minimize handling of assemblies and components.
  • Keep replacement parts in their original static-free packaging.
  • Remove all plastic, foam, vinyl, paper, and other static-generating materials from the work area.
  • Use tools that do not create ESD.